This table was made to ensure the maximum ergonomic work conditions for the single operator, based on the job to do. The operators responsible for the line loading jog is to: – Feed the line by placing the crates in the waiting station – Collect and store the empty crates – Collect the product crates to be selected – Convey waste – Remove the empty crates The table is divided into two zones: the trays side and the crates side
Voltage supply: V400
Nominal electric power: 3 Kw